Inquiry & Sampling
Six steps from receiving your inquiry to sending out samples. What is decided here decides everything that follows.
Receive and Translate the Request
We receive your request, translate it from Japanese into Chinese, and confirm the content.▸ Translation completed within one day of receipt with no error in core information; shared with the sales staff in charge.
In-house Sample Making
We make the sample in-house according to the confirmed specification.▸ Made to your specified requirements within the agreed lead time; materials and process details are shared with the sales staff.
Standard Color Swatch
Alongside the sample, we create the standard color swatch used for shade matching in production.▸ Fabric details are recorded, and it is kept as the reference for shade matching during mass production.
Sample Self-Inspection & Costing
We inspect the sample item by item and calculate the cost from actual figures.▸ Inspections are recorded per item; costing separates invoiced and non-invoiced costs and is compiled into a cost sheet.
Quotation, Final Approval and Dispatch
The project director gives final approval of the cost sheet and the sample; the quotation is issued before dispatch.▸ Nothing is dispatched before approval. Price and quality are both confirmed before anything is presented to you.
Sample Dispatch, Logging, Tracking
We dispatch the sample, log it, and share the tracking number with you and with our team.▸ The tracking number is shared, and the shipment status is followed through to delivery.
Production Preparation
Seven steps from order receipt to the start of production. Whether we can stop here decides the quality later.
Double Check of the Official Order
The official purchase order is checked at two levels: by the sales staff and by the project director.▸ Only your final official order is treated as the basis; drafts and chat logs are never used to start production.
Material Ordering & Arrival Tracking
We order materials according to the order quantity and track them until arrival.▸ A purchase order is issued, allowance for loss is built in, and arrival progress is checked throughout.
Internal Purchasing Process
This covers internal purchasing and payment procedures, so details are not disclosed.
Incoming Material Inspection
Arriving fabric and trims are checked for quantity and quality against the color swatch and the specification.▸ Anything failing is returned and never goes straight into production. Customer-supplied materials are managed including damage and loss.
Two Sealed Production Samples
Once the bulk fabric arrives, we make two sealed samples that become the production standard.▸ The designated staff verify the process, and one set is kept as the archived reference.
Final Approval Before ProductionKEY GATE
Approval is given by checking three things together: the sealed sample itself, the final instruction sheet, and the official order.▸ Mass production does not begin until the approval is signed. The final instruction sheet is the single standard.
Central Archiving of Sealed Samples
Approved sealed samples are registered and stored together.▸ The custodian and storage location are recorded so they can be retrieved for comparison at any time during production.
Production Quality Control
Three steps monitored during production. Inspection of finished goods alone cannot see these.
First-Article Inspection
After production starts, the very first piece is checked against the sealed sample across all items.▸ Mass production does not proceed until it is signed off as passing.
Two On-Site Inspections at 30% and 50%
At the 30% and 50% points of the run, we go to the factory and inspect on site.▸ Workmanship, measurements and shade differences are checked, and any problem is corrected on the spot.
Exception Reporting & Daily Report
Anything affecting quality or delivery is reported promptly, and a daily work report is submitted.▸ Exceptions are reported within two hours. The exception field on the daily report is mandatory; blank is treated as "no issue".
Final Inspection & Shipping
Four steps before shipment to Japan.
Pre-Final Check & Bulk Sample
The quantity of finished goods is confirmed, and technical requirements and appearance are given a first check.▸ Only after confirming there is no batch-level problem do we send it to final inspection.
Independent Final InspectionKEY GATE
A quality-control officer independent of production inspects to standard on a sampling basis and issues an inspection report.▸ Failures are returned for rework. Nothing ships without a passing signature.
Shipping Documents & Certification Check
The full document set is prepared from the final shipping data.▸ Quantity, product name and model number are checked for consistency, and whether any certification is required is confirmed.
Bulk Sample, Booking & Shipment Tracking
The bulk sample is prepared, shipping details confirmed, space booked, and the shipment tracked through departure.▸ Booking and tracking status are shared with those involved as they progress.
Post-Shipment Closing (Internal)
Shipping is not the end. After dispatch we carry out four closing steps: counting and photographing leftover material, booking it into the ledger, calculating final cost and reviewing the quotation, and reconciling actual cost with payment confirmation.
Because these four are internal administrative procedures, the detailed steps are not published on this page. Contact with you (reporting leftover material, additional invoicing, and payment reminders) still takes place as usual at this stage.
Together with these four, the process is complete as "24 steps". Handling one order continuously, from receipt to collection, is our basic way of working.
Why we publish the order flow itself
Quality is not decided at the moment of inspection; it is decided by the steps before it. Start mass production on vague instructions and defects will appear no matter how strictly you inspect. Conversely, if order confirmation, incoming material inspection and pre-production approval all run properly, a batch that fails entirely at inspection is almost unheard of.
This is why we define and run 24 steps. In particular we treat "final approval before production" and "independent final inspection" as gates that cannot be passed without a signature. Orders that skip these two often run into trouble somewhere.
A factory judges its own work by its own standard. We stand on the buyer's side and check each step with a different pair of eyes. That is the role of a trading company that is neither a manufacturer nor a mere broker.
Talk to us
Questions such as "which steps would you focus on for this product" are welcome. The priority steps differ by product type.
← Back to Quality ControlSix steps from receiving your inquiry to sending out samples. What is decided at this stage determines everything that follows.
Receiving and translating the customer's request
We receive your request, translate it from Japanese into Chinese, and confirm exactly what is being asked.Within one day of receipt the translation is complete with no errors on key points, and it is shared with the sales staff involved.
In-house sample making
The sample is made in-house according to the confirmed specification.It must match the specification you gave, and be on time. The materials and processes used are recorded and shared with sales.
Making standard color swatches
Along with the sample, we make standard color swatches for color matching in mass production.Fabric details are written on them, and they are kept as the reference for color matching during production.
In-house sample inspection and costing
The sample is checked item by item in-house, and cost is calculated from what it actually takes.Each check item is recorded. Costing is done and compiled into a cost sheet.
Final sample approval and quotation
The project director gives final confirmation based on the cost sheet and the sample, the quotation is submitted, and only then is the sample shipped.Nothing ships before approval. Both price and quality are confirmed before anything is presented outside.
Sample shipment, registration, tracking and notice
The sample is shipped, entered in the register, and the tracking number is shared with you and with our team.The tracking number is shared and delivery status is followed up until it arrives.
Production preparation
Seven steps from receiving the order to starting production. Whether we can stop here when something is wrong is what decides the quality later.
Double-checking the formal order
The formal purchase order is confirmed twice: by the sales staff, then by the project director.Only your final written order counts. Verbal instructions or chat messages are not used as a basis for placing work.
Material ordering and arrival tracking
Materials are ordered to the ordered quantity and tracked until they arrive.Purchase orders are issued, allowance for loss is built in from the start, and arrival status is checked at every stage.
Internal procedure (purchasing and payment)
This is our internal purchasing and payment procedure, so the details are not published.
Incoming material inspection
Incoming fabric and trims are checked for quantity and quality against the color swatches and the specification.Anything that fails goes back and never goes straight into production. Customer-supplied materials are managed, including damage and loss.
Two sealing samples for production
Once the production fabric arrives, two sealing samples are made as the standard for production.A designated person verifies the process. One set is kept on file.
Final approval of the sealing sampleKEY GATE
Approval rests on three things together: the physical sealing sample, the final instruction sheet, and the formal order.Production does not start until the approval is signed. The final instruction sheet is the single standard.
Central storage of sealing samples
Approved sealing samples are registered and kept in one place.The person responsible and the location are made explicit, so they can be checked against at any time during production.
Production quality control
Three steps that happen while the goods are being made. An inspection of the finished product alone cannot see this.
First-piece inspection
After production starts, the first piece is checked against the sealing sample on every item.Mass production does not proceed until the pass is signed.
On-site checks at the 30% and 50% points
We go to the factory and inspect at the 30% and 50% points of production.Sewing, finish, dimensions and color difference are checked, and any problem is corrected on the spot.
Exception reporting and daily reports
Anything that could affect quality or delivery is reported immediately, and a daily work report is submitted.Abnormalities are reported within two hours. The exception field on the daily report is always filled in.
Final inspection and shipment
Four steps before the goods leave for Japan.
Finished goods: first inspection
Finished quantities are confirmed, and a first inspection covers technical requirements and appearance.Only once the whole lot is confirmed defect-free does it go to final inspection.
Independent final inspectionKEY GATE
A quality control person independent of production does a sampling inspection to standard and issues an inspection report.Failures are returned and reworked. Nothing ships until the pass is signed.
Shipping documents and checking certification requirements
The full document set is prepared from the final shipment data.Quantities, item names and model numbers are checked for consistency, and whether any certification is required is confirmed as well.
Production sample, booking and shipment tracking
A production sample is prepared, shipment details are fixed, space is booked, and the shipment is tracked through to dispatch.Booking and tracking status are shared with the people involved as they change.
Closing procedures after shipment (internal)
Shipping is not the end. After shipment we run four closing steps: taking stock of and photographing leftover material, entering it in the register, calculating the final cost and reviewing the quotation, and reconciling actual cost with payment.
These four are internal procedures, so the details are not published here. Anything that concerns you, such as a report on leftover material, an additional charge, or a payment notice, is handled as usual at this stage.
This is what the 24 steps cover. One order, handled without a break from the first inquiry to the final payment: that is our basic way of working.
Why we publish the order process as well
Quality is not decided at the moment of inspection. It is decided by the steps before it. If production starts on vague instructions, defects will appear no matter how strictly you inspect. If order confirmation, incoming material checks and pre-production approval actually work, final inspection almost never turns up a large batch of defects.
That is why we run 24 fixed steps. In particular, final production approval and the independent final inspection are treated as gates: without a signature the job does not move on. Any job that skips these two runs into trouble somewhere sooner or later.
A factory judges its own work by its own standards. We stand on the buyer’s side and check each step with eyes separate from the factory. That is the role of a trading company: neither a maker nor a mere middleman.
Talk to us
Questions such as “for this product, which steps would you watch most closely?” are welcome. Which steps matter most depends on the type of product.
← Back to Quality Control